7T upgrade new possibilities
Header 1 1 7T DUST upgrade (also called dSYNC) - Installation period start 29 July 2024 Hardware (no changes in main magnet, gradient system or B0 shim system) • Digital RF chain o better definitions of gradient and RF waveforms (parallel transmit, multiband) o no switching of host between 2ch and 8ch transmit o double RF power (8 kW) for Classic system o quadrupled RF power (to 8 kW) for X-nuclei
https://www.lbic.lu.se/sites/lbic.lu.se/files/2024-03/7T_upgrade_new_possibilities.pdf - 2025-07-06